Modernizing a critical railway crossing with ponti and pro

Facts

  • Location: Tecuci North, Faurei-Tecuci (Romania)
  • Period: August 2023
  • Client: BAWI Construction SRL
  • Products: ponti 713, pro
  • Length/quantity: 2 level crossings with 13.20 running meters of track each
  • Conditions: UIC60E1, T00 sleepers, Skl 14

Advantages

  • Tolerates horizontal track alignment changes
  • Outer panel system consisting of rubber element and aluminum support
  • Low load transfer to the superstructure
  • Patented high-tech rubber surface with integrated corundum provides excellent slip resistance

Project description

In the area of the Tecuci Nord stop on the Faurei-Tecuci railway line, there are two level crossings directly behind each other. This section is considered a critical crossing as it connects the junction with the important national road in Tecuci with the crossing railway line and has a high volume of traffic.

As part of the track renewal, it was decided to modernize these two level crossings. The local conditions placed high demands on the material:

  • High volume of traffic (road and rail)
  • Demanding crossing angle of 70°
  • Significant track superelevation of 35 mm

To address these challenges, ponti 713 outer panels were combined with the proven pro inner panels, ensuring maximum durability and reliability. The entire modernization—including installation of the level crossing systems and renewal of both track and road—was completed in just two days, with the road fully closed and rail operations temporarily suspended.

The installation of the ponti and pro systems delivered a durable, low-maintenance, and traffic-safe solution at one of the most critical transport junctions in Tecuci. The rapid construction period of just two days minimized traffic disruptions and demonstrated the high installation efficiency of the chosen systems.